top of page

the case .

Since the advent of containerization in 1958, global shipping has seen unprecedented growth. Ships have evolved to carry nearly 25,000 TEUs, but port operations remain outdated, moving just 1-2 containers per crane lift. Stackloading™ is the solution to this inefficiency, offering a transformative system designed to supercharge port productivity.

The Problem: Outdated Port Inefficiencies

Productivity

Today gantry cranes average between 30-60 container per hour. Port operations are unnecessarily slow.

High Costs

Spending days in port is costly for ship owners/operators, driving up overtime expenses and slowing container deliveries

Environment

Less time in port means less schedule pressure and lower bunker consumption required to maintain schedules

Did You Know?

It takes up to 80 hours to unload and reload a 20,000 TEU vessel using traditional methods.

The Solution: Stackloading™ Technology

Stackloading™ introduces a patented system that enables simultaneous movement of multiple containers in a single lift, redefining the efficiency of port operations

Unmatched Speed

Handle up to 750 containers per hour with a single crane.

Cost Efficiency

Reduced operational time translates to significant savings.

Sustainability

Faster operations reduce fuel consumption and emissions, supporting greener port practices.

bottom of page